Arnett C. Lines Elementary School

Master Plan

*Note: This is a master list of needs for Lines over the next 20 years. It is not expected that all of these needs will be met in the near future. The Board is currently seeking community feedback to determine which of these needs should be included on a potential referendum question on April 2, 2019.

Click on each number for more information about master plan elements.
Click on the button in the top left corner to enlarge the map. Hit the “Esc” key to leave full screen.

Arnett C. Lines Elementary School was originally built in 1969 on a 3.4-acre site, with one addition completed in 1999. The school’s gross square footage is 71,800 square feet with an enrollment of approximately 450 students.

0
Square Feet of Demolition
0
Square Feet of Renovation
0
Square Feet of Additions

Identified Needs

With OME (Order Of Magnitude Cost Estimate)

Building Needs

General

$4,259,874

Additions

$3,800,931

Sensory Room Addition
Therapy Room Addition
Large Group Instruction Room
Stage Addition
Storage Addition
Administrative Suite Relocation
New Entrance Addition

Renovations

$12,463,101

Future-Ready Library Renovation
Toilet Room Renovations
Kitchen + Cafeteria Renovations
Hallway Renovation
Renovate Old Administrative Suite
Convert Classroom to Maker Space
Classroom Wing Renovations

Site Needs

Reconfigure Site Circulation
Change Drop-Off Location
Add Parking Spots
New Sidewalk to Entrance
New Entry/Exit from Site

$1,827,568