Early Learning Center Master Plan
*Note: This is a master list of needs for the ELC over the next 20 years. It is not expected that all of these needs will be met in the near future. The Board is currently seeking community feedback to determine which of these needs should be included on a potential referendum question on April 2, 2019.
Click on each number for more information about master plan elements.
Click on the button in the top left corner to enlarge the map. Hit the “Esc” key to leave full screen.
The Early Learning Center was built in 2010 on a 10-acre site adjacent to Prairie Middle School. The school’s gross square footage is 38,000 square feet with an enrollment of approximately 325 students.
Identified Needs
With OME (Order Of Magnitude Cost Estimate)
Building Needs
General
$964,289
Additions
$1,555,061
Large Group Instruction Space
Site Needs
Site Utilities, Stormwater, Site Work
$30,190