Countryside Elementary School

Master Plan

*Note: This is a master list of needs for Countryside over the next 20 years. It is not expected that all of these needs will be met in the near future. The Board is currently seeking community feedback to determine which of these needs should be included on a potential referendum question on April 2, 2019.

Click on each number for more information about master plan elements.
Click on the button in the top left corner to enlarge the map. Hit the “Esc” key to leave full screen.

Countryside Elementary School was built in 2002 on a 15-acre site. The school’s gross square footage is 66,500 square feet with an enrollment of approximately 400 students.

0
Square Feet of Demolition
0
Square Feet of Renovation
0
Square Feet of Additions

Identified Needs

With OME (Order Of Magnitude Cost Estimate)

Building Needs

General

$5,576,821

Additions

$2,459,537

2 Traveling Certified Personnel Offices
Hallway/Flex Space Addition
4 Classroom Additions

Renovations

$14,605,533

Convert 2 Classrooms to Large Group Room
Convert 2 Classrooms to Itinerant Suite
Future-Ready Library Renovation
Stage Expansion
Kitchen + Cafeteria Renovations

Site Needs

Add Parking Spots
Add Second Car Entrance
Widen Bus Loop

$696,897