Hough Street Elementary School

Master Plan Paths

Depending on how the Board of Education would like to proceed, there are two master plan paths for Hough Street Elementary School.

*Note: These options are a master list of needs for Hough over the next 20 years. It is not expected that all of these needs will be met in the near future. The Board is currently seeking community feedback to determine which of these needs should be included on a potential referendum question on April 2, 2019.

Path A

In this path, Barrington 220 would maintain and renovate the existing Hough Street School, adding big box spaces and a second floor to accommodate more students as the population continues to grow.

Path B

In this path, BarringtonĀ  220 would demolish the existing Hough St. School and rebuild a new school for 350 students on the same site. This would accommodate growth in the surrounding neighborhood and the ability to expand special programming. If this path is selected by the Board of Education, implementation logistics would be carefully considered.